Overview
Architect/Designer:
In Winter of 2021, Farnham Equipment Company contributed to a striking new gymnasium and auditorium seating at Winton Woods new 7-12 School. The new 7-12 school complemented its recently completed K-6 facility. This resulted from passage of a 2016 levy and subsequent collaboration between SHP Leading Design and Skanska Building, Inc. Farnham Equipment Company (FEC) was awarded contracts to provide multiple scopes of work for this new building which is scheduled to open its doors to students in the fall of 2021.
The gymnasium is striking, with telescopic bleachers from Hussey Seating Company on both sides. One bank has 16 tiers and connects with the upper balcony of the gymnasium. Auto-Rotating Aisle Rails and a Custom Signature Logo that spells “WWHS” give the bleacher a unique feel. In order to maximize spacing for students to enter the gymnasium through the locker rooms, a vomitory entrance was created within the seating bank to provide an easy walk way. The second bank is a smaller, 8-tier bleacher with auto-rotating aisle rails.























